One method used for partial dispositions requires us to determine the replacement cost.
For example - A tornado damaged roof
Divide the replacement cost of the disposed asset by the replacement cost of the entire asset.
The disposed asset is say $25,000.
What method do you use for the cost of the entire asset.
The cost to build a home in Virginia is much different than in California.
I located this site http://www.home-cost.com/construction-cost-per-sf.html
Would like to find a second source.
Thanks,
Mike
For example - A tornado damaged roof
Divide the replacement cost of the disposed asset by the replacement cost of the entire asset.
The disposed asset is say $25,000.
What method do you use for the cost of the entire asset.
The cost to build a home in Virginia is much different than in California.
I located this site http://www.home-cost.com/construction-cost-per-sf.html
Would like to find a second source.
Thanks,
Mike
Comment